NAST | Message Status — the cross-application output/message-control table (NAST is technically owned by SAP Basis/cross-application message determination, not PS-specific, but is landed under this… | 61 |
PRHI | Work Breakdown Structure, Edges (Hierarchy Pointer) — the linked-list structure that encodes the WBS hierarchy for a project: for every WBS element (POSNR) it records its parent project (PSP… | 7 |
PROJ | Project definition — the root master-data object for a SAP Project System project: one row per project (PSPID external ID / PSPNR internal number), carrying the organizational assignment (co… | 87 |
PRPS | WBS (Work Breakdown Structure) Element Master Data — one row per WBS element (PSPNR), the cost object that appears on ACDOCA as PS_PSP_PNR. Tie explicitly: fi/tables/ACDOCA.yaml carries a PS… | 86 |
PRTE | Scheduling Data for Project Item — one row per WBS element (POSNR, resolving to PRPS-PSPNR, under project PSPHI resolving to PROJ) carrying the full basic/forecast/actual date triad (start, … | 31 |
PRTX | PS Texts (WBS) — the key/pointer table for WBS element long texts: for a given WBS element (PRPSPNR, resolving to PRPS-PSPNR) and object type (PROBTYP), it holds the internal text-number key… | 4 |