AFKO | Production/Process Order Header Data (PP Orders) — order dates, quantities, BOM/routing references. First link in the production order spine (AFKO→AFPO→AFVC).… | 165 |
AFPO | Order Item — production order line item detail (material, quantities, goods receipt, batch, storage location).… | 95 |
AFRU | Order Completion Confirmations — the SAP analogue for the CDK twin's technician time-punch: confirmation number and counter, the order/operation the time was punched against, work centre (vi… | 28 |
AFVC | Operation Within an Order — production order operation/activity detail (work center, control key, standard values, confirmations). Terminal table of the production order spine.… | 184 |
MAPL | Assignment of Task Lists to Materials — links a material/plant to a task list group, group counter, and additional-criteria counter. Anchors which routing(s) a material can be produced again… | 25 |
MAST | Material to BOM Link — connects a material/plant/BOM-usage to its bill of material number and alternative. Entry point of the BOM chain.… | 13 |
MDKP | MRP List Header — one row per material/plant/planning-scenario MRP list run (MRP date, exception-group selection indicators, MRP-relevant master data snapshot: MRP type, controller, lot-sizi… | 97 |
MDTB | MRP Table Items — line items of an MRP list (MDKP header), one row per MRP element (planned order, purchase requisition, sales order, stock, etc.) with dates, quantities, and exception-messa… | 60 |
MDVM | Planning File Entry — flags a material/plant (or other planning object) as due for the next MRP run, carrying net-change and low-level-code re-explosion indicators plus MRP timestamps. The d… | 12 |
PLAB | Task List / Standard Network Relationships — defines predecessor/successor relationships between two task-list (or standard network) nodes, with time-interval, calendar, and duration-limit p… | 30 |
PLKO | Task List (Routing) Group Header — header data for routings/task lists, including usage, status, and planner group. First link in the routing chain (PLKO→PLPO).… | 78 |
PLMZ | Allocation of Bill of Material Items to Operations — assigns BOM component line items (STLTY/STLNR/STLAL/STLKN) to task-list operations (PLNTY/PLNNR/PLNAL/PLNKN), carrying cutting measures, … | 54 |
PLPO | Task List Operation/Activity — routing operation detail (control key, work center, standard values, scheduling). Terminal table of the routing chain.… | 225 |
STAS | BOM Item Selection — the selection/validity layer for a BOM item node (STLTY/STLNR/STLAL/STLKN), carrying valid-from date, technical status, change number, and date-shift history. The BOM it… | 21 |
STKO | BOM Header — bill of material header data (category, alternative, base quantity, status). Second link in the BOM chain (MAST→STKO→STPO).… | 34 |
STPO | BOM Item — individual component line items of a bill of material (quantity, item category, scrap, procurement). Terminal table of the BOM chain.… | 125 |